Skip to content. Skip to navigation
McGill Home SOCS Home
Personal tools
You are here: Home Announcements and Events 2008

2008

Up one level
Power Shutdown... (McConnell Eng. Bldg, from 2008-04-03 01:00 to 2008-04-03 07:00) — by Admin
SOCS systems will be unavailable on April 3 from 1:00 am to 7:00 am
Tenure granted to SOCS professors by Patrick Hayden — last modified 2008-05-28 17:53
 
Major electrical shutdown September 16th (McConnell Engineering, from 2008-09-16 04:30 to 2008-09-16 09:00) — by Andrew Bogecho
 
mail server downtime extended to 4pm (, from 2008-12-26 07:00 to 2008-12-26 16:00) — by Andrew Bogecho
Downtime extended until 4pm
mailserver upgrade complete (McConnell Engineering, from 2008-12-26 16:00 to 2008-12-31 17:00) — by Andrew Bogecho